Vissza

GYŐR-GÖNYŰ PORT DEVELOPMENT
BOAT SERVICE BUILDING

Client: Térhálózat Design Ltd.
Location: Győr-Gönyű
Year: 2014


Subject:
Static calculation of the supporting structure of the building, preparation of construction plans.

Specialty: Due to local conditions, it was not possible to support the building, so a cantilever solution was developed.


Press publications:

designboom.com >>
aasarchitecture.com >>
divisare.com >>