Vissza

Baja Bridge Inspection Walkways

Client: MÉLYTERKER Ltd.
Principal: MÁV FKG Ltd.
Location: Baja
Year: 2017-2018

Subject:
Design of a new, unique test walkway  on the Baja Danube Bridge in section 789 + 11 for the MÁV Engineering Facilities Division.