Baja Bridge Inspection Walkways
Client: MÉLYTERKER Ltd.
Principal: MÁV FKG Ltd.
Location: Baja
Year: 2017-2018
Subject: Design of a new, unique test walkway on the Baja Danube Bridge in section 789 + 11 for the MÁV Engineering Facilities Division.