Daimler-Benz Hall, Kecskemet

Mercedes-Benz Kecskemét Development Client: ATP Wien Planungs GmbH / ebner ZT GmbH Partner: Daimler-Benz AG Location: Kecskemét, Hungary Year: 2017-2019 18,200 m2 Project Subject: UTC-TP02 Presswerk Steel – ferro-concrete structure. Preparation of the construction plan of ferro-concrete structural elements. Mercedes-Benz, Kecskemét, 2nd Stage, Presswerk Hall BIM-based design Extremely heavy-duty base plate, heavy-duty cranes In the…

Bentley Salon, Budapest

Bentley Automobile Salon Design Client: Meto-builder Ltd. Principal: PORSCHE Property Management Ltd. Location: Budapest Year: 2018 Subject: Steel structure optimization, steel detailing and workshop drawings. Optimization of the available steel construction plans in order to reduce costs. Preparation of modified plans and workshop drawings. Thanks to our work, the scale of savings was close to…

Red Bull Arena, Leipzig

Expansion of Red Bull Arena Client: Bollinger und Grohmann ZT GmbH Principal: Red Bull Location: Leipzig, Germany Year: 2017-21   Subject: Permit and execution planning. Detailed planning of renovation and expansion works of access bridges, a VIP sector, a dam cut-off and freight bridges. Video: The Fun-Store is located in the dam structure we designed.

Kutaisi Air Terminal

Kutaisi Air Terminal Client: UNStudio/M.T.M. Ltd. Principal: Kutaisi International Airport Location: Tbilisi, Georgia Year: 2011-12 5,000 m2   Subject: Structural design of a 5,000-square-metre terminal, a 58-metre-high air traffic control tower, as well as the structural design for the conversion of a partially existing office building.  Specialty: Steel and wood structure. High earthquake risk, difficult…