Skip to content
ZoomDetails

Hanság Main Canal Bridge, Poprác-Hegyeshalom

Bridge DesignBy Borbély Bálint2021.07.16.

Porpác – Hegyeshalom Hanság Main Canal Location: Hanság Year: 2016   Subject: Bridge renovation.

ZoomDetails

Rába Bridge, Gyor

Bridge DesignBy Borbély Bálint2021.07.16.

Győr – Sopron Rába Bridge Location: Győr Year: 2016   Subject: Bridge renovation.

ZoomDetails

Danube Bridge, Baja

Bridge DesignBy Borbély Bálint2021.07.16.

Baja Bridge Inspection Walkways Client: MÉLYTERKER Ltd. Principal: MÁV FKG Ltd. Location: Baja Year: 2017-2018 Subject: Design of a new, unique test walkway  on the Baja Danube Bridge in section 789 + 11 for the MÁV Engineering Facilities Division.

ZoomDetails

Fish Bridge, Apple, Canada

Bridge DesignBy Borbély Bálint2021.07.16.

Pedestrian Bridge Study Plan Client: Alma City, QC, Canada Location: Alma, QC, Canada Year: 2014 120-140m Subject: Design of a steel and aluminum bridge. Preliminary planning.

ZoomDetails

Pedestrian bridge, Jaszberény

Bridge DesignBy Borbély Bálint2021.07.16.

Pedestrian Bridge over the Zagyva in Jászberény Client: Council of Jászberény Location: Jászberény Year: 2013-2014   Subject: Design a softly arched steel girder bridge.

© CEOS All rights reserved.
  • Sitemap
  • Privacy Policy
  • Cookie information
Footer Menu - EN
Go to Top
Kedves Látogató! Tájékoztatjuk, hogy a honlap felhasználói élmény fokozásának érdekében sütiket alkalmazunk. A honlapunk használatával ön a tájékoztatásunkat tudomásul veszi.Elfogadom